Dubai Sailing Hotel, United Arab Emirates, is a seven star hotel with the highest building height in the world. In its extremely luxurious presidential suites and royal suites. If you look around, you can see gold everywhere. The toilet is made of 24K pure gold. Even the doorknob, the toilet pipe, and even a piece of note paper are full of gold. The hotel was built in 1994 and opened in December 1999. The whole hotel contains 26 tons of gold, is more than 300 meters high, and has 27 floors. On November 22, 2011, the 2011 World Toilet Summit and Exhibition was opened in Haikou, Hainan Province. The most “domineering” taste in the exhibition hall was the “gold toilet”, which inherited the artistic style of the gold toilet in Europe’s most luxurious Milos maze. It was made of 32 kg of gold, with a total price of 1.28 million yuan. In June 2014, a gold toilet was placed in Yinchuan Red Star Macalline.
The production of closestool is called wet process in the field of civil porcelain. The specific construction process involves the following steps: 1. pulping – grinding raw materials and mixing them with water in proportion to make raw slurry; 2. molding – injecting raw slurry into the toilet mold to make the shape of the closestool. 3. Repair and drying – place the shaped toilet in the drying room for drying and molding after detailed repair. 4. Glazing and firing – The shaped toilet is glazed and then fired in the kiln. 5. Inspection – the burnt toilet shall be inspected, and the installation metal parts of the products passing the strength and stain resistance inspection shall be sold out of the factory.